
I had a half bathroom in my guest room but wanted a second full bathroom, so removed the sink out of the half and installed a shower. I built the vanity in the room and added a make-up area with seating. I used my Kreg beaded faceframe system and to add a bead around the faceframe and built inset doors and drawers. I used Behr paint and used valspar antiquing glaze for the finish. I used the leftover shower tiles to make the countertop.

Built from Plan(s)
Estimated Cost
75 dollars not including sink and faucet
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Behr satin paint and valspar antiquing glaze
Recommended Skill Level
Intermediate