Found this plan and loved the look. Decided to go for it. I bought all the wood on a Saturday afternoon and started cutting it out on Sunday morning. I was able to get everything done with the exception of stain and poly in 1 day. The longest part was waiting for the polyurethane to dry completely before bringing it inside. Due to the size of this bed, it is best to bring it inside in multiple pieces and complete the final assembly in the room.
Built from Plan(s)
Estimated Cost
$140
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Golden Pecan for 15 mins. Wipe off and let sit for 24 hours. Finish with a coat of polyurethane
Recommended Skill Level
Intermediate