Community Brag Posts

Custom Bookshelf for School

Submitted by Anonymous (not verified) on Mon, 03/18/2024 - 11:04

I needed a bookshelf for my classroom. I decided to make it multi-use by adding some extra storage shelves for classroom supplies. I used your design app to create the plans. I then used an online tool that allows you to input dimensions of parts and the size of the material you are working from to optimize layout and minimize waste. Total material was 1 4x8 sheet of 3/4 plywood for the frame and shelves and a 4x4 sheet of 1/4 for the back. I finished it with a 1" pine face frame.

Charlesh62

Comments

LuckyGirl

Sat, 07/06/2024 - 14:18

It's true that having a well-organized workspace for a student increases enthusiasm for completing assignments. A tidy and comfortable study area makes it easier to focus and be productive. However, it never hurts to have https://www.phdresearchproposal.org/ at hand. Their professionalism can help students completely eliminate writing stress. By using their services, students can manage their workload better and ensure high-quality work without feeling overwhelmed.

Daughter's new modified Loft Bed

I used the Loft Bed design as a starting point but modified it to meet our specs. We used the Full Size version (added the 15 inches to the width and also made all the legs 8 inches higher. We felt like the plan was great but we wanted a little more headroom underneath. This did make figuring out the ladder dimensions a bit complicated, but with some common sense (and a little trial and error) we were very pleased with the results! We originally were going to just purchase an IKEA Stora loft bed. It was on sale for approximately $300.00 plus shipping, which would have been an additional $300.00! Instead we built this and kept the price around $250.00. This bed is extremely sturdy, doesn't squeak at all, and can easily hold a full size adult. Thank you Ana for the great plans!!

Built from Plan(s)
Estimated Cost
$250
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Black Valspar Latex Paint/Primer
Recommended Skill Level
Beginner

Trash bin

We really needed something to put our recycling in. A paper bag on the floor just wasn't cutting it anymore! I saw this plan and knew it would be perfect, especially because it fits your normal grocery store paper bags. It was also my first project using a Kreg-Jig and I love it. A lot. Just fyi for anyone on the fence like I was for a while.

Estimated Cost
$15-$20
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Valspar Spring Sprout Satin spray paint
Recommended Skill Level
Beginner

Play Kitchen

Submitted by Anonymous (not verified) on Tue, 09/06/2016 - 09:48

Had a lot of fun building this and learned a lot.  The most important part is that my daughter absolutely loves it.  Here are some mistakes that I made so you can try to avoid them:

- The cut list and the photo of how to get the cuts don't match.  Use the cut list!  The photo of how to lay out the cuts only has one of the 14 1/4" x 12" but you need two.  Instead it shows two 6" x 12" and if you cut the 6" on the bottom board you won't have enough length to get the second 14 1/4".  I had to head back out to HD to get another board.

- I planned to cut it out and dry assemble with pocket screws and then disassemble it for paint.  Unfortunately, the cheap whitewood lumber from HD started to warp when cut and I managed to get it assembled and fairly square and was worried that if I took it apart that it would never go back together square so instead of using a paint sprayer I had to paint by hand which took a lot longer.  I either needed to buy the lumber weeks earlier and let it acclimate to my garage or just know that it was never going to get disassembled.

- Speaking of painting, the directions on the can said recoat was possible after 4 hours and I had to wait at least 24 due to work so I figured I was fine.  I primed the wood first and then started with the latex paint from HD.  Unfortunately the last coat led to something called "blocking" and left the kitchen with a tacky feeling.  It is starting to go away but was a real bummer after all the work to build and paint it and find it had a sticky feeling that kind of killed the excitement.  I think its ok now but I would give each coat more time to not just dry but cure to avoid this in the future.  

- We kept adding things as we went like fridge shelves, oven racks, a microwave, deeper full length shelf mounted on top, etc.  This made assembly a pain because it took a lot to figure out the final order.  The biggest holdup was we decided to use fake marble contact paper on the countertop and wanted to do that at the very end so it didn't get ruined.  But without the counter screwed down, I couldn't install the backsplash, shelf, and back.  

- Knobs.  I think I have figured out a way to make them click but just ran out of time and had to get it done.  I bought aluminum bushings to fit in the screw holes to keep the bolts straight and give them something to spin freely against.  In the back, I had used a forstner bit to drill out 1" holes where the bolt would come through and sit centered.  To make the clicking sound, I drilled out some dowels and screwed them onto the end of the bolt so I could drill a 1/16" hole to glue in a brad nail.  In the larger forstner holes, I drilled small holes and put thin strips of plastic.  This would have worked like a playing card in a bicycle spoke.  Unfortunately, finding the right kind of plastic and getting the brad nail centered started to take too much time and I had to scrap the idea.  I'll keep it in my back pocket for the next time I can spend time to make upgrades.

- Hinges.  I didn't like the look of exposed hinges so I used 90 degree surface mount hidden hinges.  They work well but have a fair amount of closing force for such light cabinets.  I'll have to teach my daughter to keep her fingers out of the way or there may be some ouchies.  These tend to close more than 90 degrees so I also bought some small magnetic catches to hold the door flat to the front and created a positive close.  I think they actually give it a more finished feel.  

- I rabbeted the oven door to mount the plexiglass and wish I had taken the time to do that for the fridge and freezer door because it would have looked cleaner but in reality my daughter couldn't care less.  

- For the fridge shelves, I wish I had taken the time to cut dados to hold them but I didn't want to disassemble the frame and it was already painted when we decided to add shelves.

- Cut the sink hole tight and just snuggly fit the sink you choose.  I didn't glue it because I hear it is going to get dirty and sticky so it will be a lot easier to just take it out and wash it then mess with trying to clean it in place. 

 

For supplies, we used common whitewood lumber from HD, Behr latex paint, knobs, hinges, and latches from HD, the marble contact paper came from Amazon, the backsplash is peel-and-stick vinyl tile from Wayfair (4 was enough if you cut them right), the faucet is a cheap $15 faucet from Amazon, the sink is a 1 1/2lb Loaf Pan from Amazon, the knobs were 2" circles from Joannes, the buttons are some project wood pieces from Joannes with stick on numbers sprayed with clear Acrylic, and the motion lights were a cheap 3 pack from Amazon.

Built from Plan(s)
Estimated Cost
$300.
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Latex Paint
Recommended Skill Level
Intermediate

My First Bed

Submitted by jfloyd on Fri, 06/19/2020 - 08:20

We mashed up the headboard featured on Ana's site with a different design for the platform. Turned out good, not perfect, but this was my very first project.

Estimated Cost
$200
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Shellac, clear
Recommended Skill Level
Advanced

Adirondack Chairs

Submitted by jcordle on Thu, 08/16/2012 - 11:48

These chairs are fairly easy to make. The side boards were the hardest part.

Built from Plan(s)
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
I used Spray Primer and Spray Paint.
Sand very well. Any base primer will work and use any color of paint that you choose.
Recommended Skill Level
Beginner

Jewelry Cabinet

Submitted by lpark625 on Sat, 06/07/2014 - 14:56

My hubby made this for me this weekend! Blue is the accent color for our yellow and grey bedroom. It's beautiful and practical!

Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Minwax Island Waters
Recommended Skill Level
Starter Project

Leaning Bathroom Shelf

This was a perfect Labor Day weekend project and solved a storage problem in my cramped bathroom. I plan on getting some wicker baskets or bins to store toiletries on the shelves. It's also a great spot to store fresh towels so guests have easy access. The shelf feels very stable when leaning against the wall. I curved/rounded the front,  top corners of the shells using 40 grit sandpaper. 

Estimated Cost
I had a lot of the lumber on hand from other projects but I would guess about $20-25
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Paint & wipe on poly
Recommended Skill Level
Beginner

Wood Radiator Cover

Submitted by Anonymous (not verified) on Tue, 04/02/2024 - 10:00

Radiator Cover! My son was starting to crawl and be interested in the giant radiator in his room, so it was time to cover it. I'm so happy with how it turned out and since we left 4-5 inches of space from the top, we can use it as a space to keep his air filter & light. I left 2-3 inches around the sides as well and put a board across the back for support and to keep the cover in place.

Margaret Cember

childs adirondack table and chairs

Submitted by becca9872 on Sun, 08/19/2012 - 19:49

This is a Christmas gift for my granddaughters, and it was a huge hit! It is white pine 1x4's with 4 coats of polyurethane for a smooth finish.

Estimated Time Investment
Day Project (6-9 Hours)
Recommended Skill Level
Beginner

Comments

Linzy's outdoor play escape

Submitted by Myk3 on Mon, 06/09/2014 - 13:03

Built using the plans as a starting point and built it bigger than the plans called for.. The deck is 10x10 and the playhouse is 6x10. I used pressure treated lumber for everything but the playhouse. I still need to paint the house and stain the deck, then put the roof on.. if it would stop raining.. Once i'm done staining the deck I can put the slide back on also. ''

Swings, monkey bars, and rings / trapeze was ordered from Amazon.

Built from Plan(s)
Estimated Cost
2000
Estimated Time Investment
Week Long Project (20 Hours or More)
Recommended Skill Level
Intermediate

Subway Tile Bookcase

Submitted by Anonymous (not verified) on Sat, 09/10/2016 - 06:34

Project costed more than expected but only because I had to buy the Kreg and a new hand sander.  Other than that probably close to $120.  Great proejct and great addition to our home!

Built from Plan(s)
Estimated Cost
Expected: $90
Actual: $120
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Paint / semi-gloss
Recommended Skill Level
Beginner

Dawsen media console

Submitted by Marcus611 on Fri, 06/13/2014 - 11:05

This is the first piece that I have built from your website. The plans were easy to follow. I had to change the dimensions to fit the console where we wanted so it made the parts list a little more time consuming to figure out with a few mishaps in the original plans. After that it was smooth sailing.

I tried to save money where I could so I created my own slides for the drawers rather than spending $100 for the slides. They turned out great. I also made the chalk paint with plaster of Paris since the cost of chalk paint is pretty high.

My wife and i were very pleased with the outcome. Thank you Ana for the great plans. With a little basic wood working knowledge and the proper tools, just about anyone could make this piece.

Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Chalk paint
Recommended Skill Level
Intermediate

Awesome shelves!

Submitted by Anonymous (not verified) on Mon, 09/12/2016 - 17:18

Garage had no shelving, now after a weekend of work we can store everything! So happy with these shelves, thanks for the great plan!

Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner
Back