Community Brag Posts

Rustic Dresser

Submitted by kmh380 on Sun, 09/21/2014 - 20:20

9 drawer dresser made out of African mahogany wood. 

Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Matte poly
Recommended Skill Level
Advanced

Comments

Farm table

Submitted by Anonymous (not verified) on Sun, 09/20/2020 - 19:15

First table I’ve built and thanks for the easy to follow plans. Love this site!

Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Paint, stain and sealant
Recommended Skill Level
Intermediate

Dog Crate Build for Bullet. Very easy, and inexpensive.

Built for our new puppy, Bullet. He is a brindle boxer, and our new pride and joy! Dimensions of this crate will work for him for approximately a year or so. I assume at some point i'll need to build another, slightly larger version of this one. But all-in-all it came out excellent. One issue in the cut list as mentioned before, but you figure it out when you get to it. Not a big deal. Time frame for cutting and assembly is would probably have been just a few hours(3-4) had I not spent 2 days sanding, staining, lacquering, waiting for lacquer to dry, sanding, waxing and polishing.

Estimated Cost
$50 without stain/lacquer materials.
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Red Oak stain w/lacquer.
Recommended Skill Level
Beginner

Comments

Rustic X Coffee table by Corey

Submitted by Anonymous (not verified) on Tue, 01/10/2017 - 14:29

I had a great time building this coffee table and the instructions were easy to follow, especially for a beginner like me. Thanks Ana! 

Estimated Cost
$80
Estimated Time Investment
Afternoon Project (3-6 Hours)
Recommended Skill Level
Beginner

Farmhouse Counter Stools

Submitted by wbengle77 on Wed, 09/23/2020 - 09:09

This was a pretty strait forward project, the only change i made was the wood used. I did not use the 2x2 furring strips i opted for the upgraded Select Pine Boards. So it changed from 3 bucks to 12 a board. I also used metal nylon feet.

Built from Plan(s)
Estimated Cost
depends on wood and finish
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
I used an antiquing wax, then I used butcher block oil and wax to finish.
Recommended Skill Level
Starter Project

Comments

Rustic X coffee table - first project!!

A little warmer than I had planned but very happy with my completed first project. Thanks Ana!

Built from Plan(s)
Estimated Cost
~200
Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

Comments

Sliding Door Console w/ Fireplace

Submitted by schke1 on Sat, 01/14/2017 - 15:40

I used the Sliding Door Console and modified it for a 36" Electric Fireplace insert.  Behind the doors are the shelves as per the original design.  

I did purchase the door track - and used reclaimed wood for the doors.  These pieces are about 1/4 - 3/4" wide and vary in color.  

Built from Plan(s)
Estimated Cost
Wood was around $125. Door hanger was just under $100. Fireplace was $349.
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Miniwax Dark Walnut and Polycrylic - No stain on reclaimed wood
Recommended Skill Level
Intermediate

Farmhouse Cubbies for Tots

I don't have a mudroom so I needed better organization for shoes, coats, and whatnot. I wanted it to match the Farmhouse Barn Door Entertainment Center I built, so I used the same paint and stain. My sizes were a tad smaller than most storage boxes, so I had to custom-build the cubby boxes. I added a rope around the whole perimeter as well as felt on the bottom to prevent scratching. The kids love it!

Estimated Time Investment
Week Long Project (20 Hours or More)
Recommended Skill Level
Intermediate

Comments

Modified farmhouse table

Submitted by lphair on Sun, 12/23/2012 - 21:30

This is modified from Ana's farmhouse table plans and Tommy's farmhouse table plans. It measures six feet long and I used 2x12's for the four parallel boards and 4x4 posts.

Estimated Cost
$135
Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

Comments

Jake

Wed, 12/26/2012 - 10:59

You did a great job on this table. I built the farmhouse table and I think I may add the supports you added to the bottom of the legs and between the end legs. I am interested if you could detail how this table cost $150? I was guessing no more than $75 or maybe even less.

lphair

Fri, 12/28/2012 - 18:56

Thanks Jake! The reason it cost $150 is primarily due to my location. I'm up in Anchorage, Alaska and the lumber I was finding at Home Depot and Lowes was either cracked or moldy since they seem to store their lumber outside in the snow until they need to restock the shelves inside. I went to a local lumber store and paid a little extra. Also, I spent $35 on the finish: pre-stain wood conditioner, rustoleum oil-based finish, rustoleum polyurethane. I bought a quart size can of each, but could have easily gotten away with half that. So, in reality it should have been a lot less. My lumber breakdown was as follows:
(4) 2x12x8' @$17 each
(2) 4x4x10' @$13 each
(5?) 2x4x8' @$4 each

Jake

Fri, 12/28/2012 - 19:39

Thanks for clearing up the cost issue. I usually just estimate how much of the paint or stain I really used. Cheaper to buy by the quart or gallon. Sometimes if the project is small I buy the sample paint for $2 or $3 but it only comes in flat, You are not alone with cruddy wood. Orange and Blue in south Texas is just as bad. Mostly bent and warped wood with lots of knots and bark. I tried a regular lumber yard yesterday for three boards and I was looked at like I wasn't there. I am old enough to remember when I could go to the lumber yard and actually buy 1/4" and 1/2" lumber. Must be cold up there.

king bed from reclaimed barn wood

Submitted by rebarn14 on Fri, 10/03/2014 - 07:24

First project from dad tearing down his barn. Used ana's plans for queen bed and added to fit king dimensions. Husband also requested a tall bed so I added 6 inches to her measurements.

Estimated Cost
$80 bc I used reclaimed wood. Most of that is screws and plywood
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Stained with a mix of dark oak and black. Many coats of polyurethane bc it soaked in to the old wood
Recommended Skill Level
Beginner

Cassidy King Bed

Submitted by Anonymous (not verified) on Mon, 01/16/2017 - 18:19

We executed the Cassidy King bed plan to the letter apart from the shims decoration on the head and footboard. We opted for trimming both the head and footboard with some simple trim to keep the design clean. We also used 2x12s for the side rails and added extra frame supports to ensure the bed was extra sturdy, and it is rock solid! As you can see from some of the pictures after putting the bed together using our box springs we felt it made the mattress look too high. We then decided to put down ¾ inch plywood and take out the box springs (our mattress is really thick, nearly 18’’). All in all, we are very pleased with how this plan turned out. Thank you, Anna, for your awesome plans! This is the third project we have made from your site and all of them have turned out true to the plans and looking really nice.  

Built from Plan(s)
Estimated Cost
$200
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Sherwin Williams Classic Cherry stain and Sherwin Williams Poly
Recommended Skill Level
Intermediate

Parson Work Desk

Submitted by Anonymous (not verified) on Fri, 10/02/2020 - 16:33

Built for a small office at work. Finished in their favorite color! Beautiful pieced together oak top

Built from Plan(s)
Estimated Cost
$150
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Clear poly top and semigloss orchid purple paint
Recommended Skill Level
Intermediate

Comments

Mom's Lego Table

Submitted by adobbins29 on Wed, 12/26/2012 - 13:34

My son Bryce built the Lego Table for the Bell County Youth Fair and Livestock Show. He was entered as the youngest student at 9 years old and competed in the Junior Woodworking division. The table placed third out of 9 entries and he was the youngest kid to place. He was so excited! The table was easy to build and looks fantastic. Thank you for the plans. We are currently about to start work for this year's show.

Estimated Cost
$150
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Painted base and stained top
Recommended Skill Level
Beginner

Hall Tree - 1st Wedding Anniversary Gift

Submitted by Smokeydog on Tue, 10/07/2014 - 08:09

I combined Mimi's Hall Tree with the Alexia Bench for this project.  It really turned out great. My son and his wife love it. It also made me feel pretty good that I built something for them that hopefully will be passed down to future generations. 

Estimated Cost
300.00
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Satin spray paint.
Recommended Skill Level
Intermediate

Toddler Farmhouse/Platform Bed

Submitted by Anonymous (not verified) on Thu, 01/19/2017 - 09:54

Our 18 month old was constantly climbing out of her crib so we got a cheap toddler bed and tried it out. She liked to go under the bed and almost always got one of her legs stuck between the slats on the under side of the matress. 

I decided to build a bed and found Anna White's Toddler Farmhouse bed plans. We modified the plans ever so slightly to make it a platform style to address our original issue.

For the stain, we used 1 coat of steel wool and white vinegar that sat for 24 hours and prepped the wood with 3 bags of black tea steeped in boiling water for 10 minutes. The color was exactly what we were looking for.

This is my first project and there was a good amount of learning involved but it turned out amazing!

Built from Plan(s)
Estimated Cost
$35
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
White Vinegar and Steel Wool - 24 hour soaking time - 1 Coat
Large Mason Jar of Black Tea - Steeped for 10 minutes in boiling water, 3 bags - 2 Coats
Recommended Skill Level
Starter Project

Grant Secretary Desk

I never got around to building the top hutch section, but my wife loves this desk.

Comments

Little Cottage Loft bed

Submitted by banderson9 on Sat, 10/11/2014 - 18:09

Built for my three year old and she LOVES it, Took a while to build but great plans!

Built from Plan(s)
Estimated Cost
$300
Estimated Time Investment
Week Long Project (20 Hours or More)
Recommended Skill Level
Intermediate

Farmhouse King

Submitted by Anonymous (not verified) on Sun, 01/22/2017 - 19:25

This was my first build this large and turned out great!  Thanks to the DIY plans provided here.  Thank you so much for such a great place!

We did make the foot board about 12 inches taller as we prefer a taller foot board.

Estimated Cost
$200
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Primer and then black paint
Recommended Skill Level
Intermediate

Simple Bed (twin size)

Submitted by giorod82 on Sat, 10/10/2020 - 15:42

Simple twin bed project. The only modification I made was to shorten the height of the head board to the same size as the foot board.

Built from Plan(s)
Estimated Cost
$100
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Minwax Red Mahogany
Recommended Skill Level
Beginner

Book Boxes for my Kinders

I was inspired to build a set of book boxes for my classroom after seeing Ana's plans for her Wood Magazine File. I'm currently using those cheap cardboard book boxes teachers can buy from those big teacher stores, but they're starting to fall apart after only 2 months! I'm trying to use only scrap wood, but I'll probably be forced to go out and buy another sheet of plywood soon.

I covered them in scrapbook paper I found on clearance at Michaels and used Mod Podge and nails I already had. For the bottoms I used left over wood from making the Modern Outdoor Table which I have yet to post. So, these babies have only cost me a little over a dollar to make. I'm not sure how long the decoupaged paper is going to last with 5 year olds. My roommate suggested using fabric instead and I think I may do that with the remainder wood I have.

*Tip: Make sure your cuts are straight because only the bottom piece of lumber can be nailed. You have to glue the other joints which can be tricky with funky cuts.

Built from Plan(s)
Estimated Cost
$1.25 if using scraps
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Mod Podge
Recommended Skill Level
Starter Project

Rustic X Coffee Table

Submitted by mchunt25 on Wed, 10/15/2014 - 07:17

This was a great project for me. I am a beginner and building a coffee table this nice seemed too difficult. Fortunately, it turned out better than I expected. The biggest difficulty for me was putting in the 1x12's on the bottom. That was really my fault because I didn't square up the sides properly. Rookie mistake and lesson learned. 

Built from Plan(s)
Estimated Cost
$100
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
2 Coats of Stain
2 Coats of Light Blue Paint
Recommended Skill Level
Beginner