Community Brag Posts

Utility Room Shelves

Submitted by Anonymous (not verified) on Tue, 09/13/2016 - 20:58

I'm so grateful for these plans! Since we were building in a basement against a concrete wall, we just made each side with the vertical 2x4 supports, then anchored the shelves to the exposed studs on the side walls for safety. This project was so fast and easy -- I put them together one night after the kids went to bed. They're 8' long and 2' deep, very sturdy, and they were highly economical to build. I love that the shelf is smooth and flat, too, as this makes it easy to store small things as well as large totes.

Estimated Cost
$70
Estimated Time Investment
An Hour or Two (0-2 Hours)
Finish Used
None
Recommended Skill Level
Starter Project

Narrow Console Table

This is my first try at one of your projects. I made the console table 48 inches long to fit the space of our entry way. I thank you for all of your amazing content, and still having informative and wholesome things to watch.

Estimated Cost
60
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Sherwin Williams Weathered Teak
Recommended Skill Level
Beginner

Long Outdoor Table

Submitted by Anonymous (not verified) on Thu, 04/18/2024 - 12:44

We built your farm table following your instructions for a table on our back deck. It was our first project and we had no clue what we were doing, but it turned out wonderfully! We have already received many compliments! Very excited to do the benches next!

rachellake.ca

Toddler Chalkboard

This was my very first woodworking project. It took me longer than it should have due to my unfamiliarity with power tools. Overall I would say that this project is a pretty easy build. The plans were clear, and I only made a few changes/additions. I increased the overall height of the chalkboard by 4" and attached the back legs with a hinge rather than screwing straight into the back of the chalkboard.

Built from Plan(s)
Estimated Cost
$60 for lumber and finishing materials
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
I used spray paint for the tray and body of the chalkboard and used a can of chalkboard paint applied by brush for the chalkboard itself. I noticed that it was difficult to get even coverage with the spray paint, and the paint would soak into some parts of the wood and the grain would show through.
Recommended Skill Level
Starter Project

Comments

spiceylg

Sun, 08/26/2012 - 04:00

This really came out nice and welcome to the community. Love the idea of the hinges; smart idea! If you painted directly onto bare wood, without applying primer first, that would be a cause of the paint not taking evenly. The bare wood can be like a sponge so primer helps with it adhering to the wood.

Navy_Woodworker

Tue, 08/28/2012 - 22:53

Thank you spiceylg for the help. I should have applied primer first, but the spray paint I used said that no primer was necessary. After the first coat didn't take I should have went back and applied a primer coat.

Pallet Wood Crates & Easy Inkjet Image Transfer

Submitted by ananda on Thu, 06/19/2014 - 21:06

These crates are inspired by vintage farm and orchard crates, made from discarded pallets, and personalized with a
easy image transfer method using only wax paper and inkjet printer. At
the end you will also see some fabulous diy failures so you can get a
more consistent result with this technique.  Also included is a nice homemade non-toxic furniture wax recipe to finish the crates! You can find the full detail tutorial here- http://www.apieceofrainbow.com/diy-pallet-wood-crates-easy-image-transfer/

Estimated Cost
$5
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
homemade non-toxic furniture wax
Recommended Skill Level
Starter Project

Comments

Triple bunk bed

Submitted by Anonymous (not verified) on Sun, 09/18/2016 - 09:01

Thank you for sharing the plans for this. I really liked how out breaks down into 8 pieces to move. I felt the plans were lacking a bit of detail, I ended up downloading the sketch up app for $10. That app helped a ton! Due to lack of detail and not thinking ahead I ended up putting a couple bolt holes in bad spots and had to wood fill and move them. I also didn't understand what mirror image of left and right side were. Lol. I laid down the left side and carefully assembled, then I made the right side to look exactly like it. Lifted the left side, looks beautiful, lifted the right side and looks like a million screws. Lol. I also had to add additional wood to make it work since I essentially built the side inside out. I think I put the slats in a little closer then the plans suggested, I ended up cutting a few more if you notice the gap in bottom bunk slats. I also purchased "backpack strap" from ace hardware and laid it across the slats. I screwed the end slats and stapled the middle ones to the strap. All in all, a great project and it will last for years. Thanks for sharing. Built from http://www.ana-white.com/2013/06/plans/triple-bunk-staggered-beds

Built from Plan(s)
Estimated Cost
$275 for wood and bolts.
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
I built this for a friend who wanted it delivered with unfinished wood, I would have used either, varnish or high goods paint for the kids bed.
Recommended Skill Level
Intermediate

Workbench with pegboard

Submitted by bredbu on Wed, 07/01/2020 - 18:37

I made a workbench for my garage it was pretty easy. I also made an instructional youtube video if you want to learn how to make it. #diy #workbench #bench

Estimated Cost
125
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
none
Recommended Skill Level
Beginner

2-Person Desk

When my husband and I both started grad school, we needed space for both of us to work on our computers at the same time (after the baby went to bed!). I couldn't find exactly what we wanted to fit the space, so we built it! We got the Kreg Jig, which worked wonderfully! You can see some pocket holes in the picture, but they were hidden once we put all our stuff on the shelves. Our space was smaller than Ana's, so we made the two end units narrower (they still fit our CPUs and we used a doorknob hole drill bit to put cord management holes in the back panel). We love it! We built our deck before, but this was our first foray into furniture-making. We had fun and it turned out so well that we have a list of things to build next (we're thinking a murphy bed).

Estimated Cost
$200
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
MinWax Red Oak, 2 coats, with 2 coats of polyurethane on top.
Recommended Skill Level
Intermediate

Pallet Shelf

Free, quick, and easy!

Estimated Cost
Loose change
Estimated Time Investment
An Hour or Two (0-2 Hours)
Finish Used
A quick light sand on edges, then American Chestnut stain.
Recommended Skill Level
Starter Project

Comments

CalKing Farmhouse Bed with Storage with Upcycled Solid Oak

Submitted by fitgirl on Thu, 09/22/2016 - 13:49

So why did I decide to build my own bed?

1. Cal King Frames are hard to come by in Canada and if purchased from a store, they cost an arm and a leg.  Also I wanted a new mattress made of solid latex - very spendy -  so our budget was already maxed out from that.

2. You come across a Kijiji (canada's craiglist) listing for 200sq ft of 3/4" solid oak flooring

3. You know Ana's plans will help tremondously and it gives you the boost to finally decide - yes I can build my own furniture.

 

So the upcycling made this all doable!  Some random Kijijier thought to pass along the left overs from a flooring install (the other option was burning it he said)  I said thank you very much and took all that wood home.  Now he had bought raw rustic grade oak.  Only $1.89 a sq/ft to buy FYI) 

So it was not perfect, with many pits, wormholes, cracking and complete holes. But the raw oak was great for a number of things - the distressing was real - no extra effort required, also the raw oak was easily stained with my homemade iron acetate stain (steel wool and vinegar) and I was able to bevel the edges without ruining an existing finish.

Thankfully I only needed a few long boards for the framing and was able to use the better short boards for building out the foot and headboards.  I improvised the posts on the end with a clever mitered 4 board combination.  Cutting just the tongue and the inside edge of the floorboard created a inset detail on the post that is very forgiving to my crappy cuts and ended up doing the trick.  I also saved my sawdust from cutting to mix with glue and fill the major holes and pits in the wood.  This took the stain very nicely and didn't add any extra cost to the project.  Anyways if anyone wants more suggestions on making use of cut off material just message or comment below.

By the way the plan is awesome and I much appreciated it during the process.  I did complicate things by making the drawers 24" deep vs 16" and having to upcycle a product rather than just buying material.  

To make use of the depth with a cal-king I decided to go with 24" deep drawers - fyi this means more material, more dollars,and more weight!  Huge amounts of weight, once since I decided to go with 3/4" Birch ply for the build.  I lift for fun and fitness so I managed, but beforewarned - the plywood frames are awkward and heavy.

I ended up needing 4 sheets of 3/4" Birch ply b/c of the upgraded sizing.  Even at 50% off (lucky me) this still was $160 in plywood + $50 for Luann for drawer bottoms and closing the back of the frame behind the drawers.  I also used full extension drawer slides so that I can actually access all that storage so set me back another $180.   I got the lights from Lowes for $60 for the pair.

 

Total cost $500 + free oak floor cast off + time = a priceless project

  

Estimated Cost
$500
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Iron Acetate (homemade Steel wool soaked in Vinegar) Topcoat made with homemade beeswax/coconut oil blend.
Recommended Skill Level
Intermediate

Dance Dress Up Storage

Submitted by Missy Tate on Wed, 08/29/2012 - 13:52

I used the project plan for dress up storage to make a place to put my girls dance things! I have five girls and they are all in dance. We had all the dance leotards, ballet shoes, tap shoes, tights, etc... stuffed in one box! Thanks Anna for sharing this plan! Its so useful, and a great addition to their room. Not to mention sooo cute!

Estimated Cost
25$
Estimated Time Investment
Afternoon Project (3-6 Hours)
Recommended Skill Level
Beginner

Pallet wall shelves

Submitted by pseymour on Tue, 06/24/2014 - 21:53

Made this Pallet from scratch with standard 2x4's and 1x4 pine boards. Stained the 2x4's a medium dark and used white chalk paint on the 1x4's. Project came out very nice and the wifey loved it. Happy Wife, Happy life.

Estimated Cost
$80
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
used Varathane Ash for the stain, and White Chalk paint for the slats.
Recommended Skill Level
Beginner

Farmhouse Table

Submitted by Anonymous (not verified) on Sun, 09/25/2016 - 16:16

Made some size modifications. Loved the end product!

Estimated Cost
600.00
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Dark Walnut
Recommended Skill Level
Beginner

My jumbo king bed

Submitted by rach1fun on Mon, 07/06/2020 - 08:34

I used Ana's updated farmhouse king bed plans, but I added a few extra inches to the height because I thought it looked low....I may have added a couple inches to much lol. Good thing we're tall in this house

Finish Used
First stained with a coat of special walnut, then a coat of Weathered oak
Recommended Skill Level
Beginner

Storage for baby toys, burp cloths and boppy!

Submitted by katetb on Fri, 08/31/2012 - 06:57

After buying materials for a not so baby friendly antique factory cart coffee table, which I unhappily had to veto, my husband was able to quickly assemble this table and it sat unfinished for a few months. He painted it a black semi-gloss inside and out.

It fits the boppy, lots of blankets and 4 fabric cubes to hold toys, rings, burp cloths... perfect to hide at least some of the baby stuff that has taken over our home.

And now I NEED the apothecary trundle coffee table for the den!

Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

Beach Shack

Submitted by jvuijk on Fri, 06/27/2014 - 19:28

Customized version of the clubhouse bed that is so popular! We went the extra mile on the finishing touches to ensure an awesome bed for our little guy! We made the bed taller for more space underneath and polished up the finished product to create a higher end look. Care was taken to precisely sand all areas of the bed for a smooth finish and polished look. All pocket-holes are filled with plugs and sanded smooth on the inside of the bed for an overall finished product. No shortcuts taken! We went the extra mile and painted the carriage bolts so they would blend in with the whitewash finish and also recessed the nut on the back of the legs for safety and added a cap so they are not visible. Top of the bed, above the door, is filled in and a custom ladder finishes off the look. We went with smaller lumber to build the ladder and it is perfect!! We are over the moon with this project and will be building more items as fast as we can. Also, the sign, under-bed shelves, and industrial shelves were built by my husband. He did an epic job creating this room!! We used better grade wood and spent a lot of time sanding to ensure a great bed in the end. We also went with a Benjamin Moore stain that was a little more expensive and took the time to finish the slats under the bed.

Built from Plan(s)
Estimated Cost
$400
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Benjamin Moore exterior semi-transparent stain.
Recommended Skill Level
Intermediate

Comments

jeawels

Mon, 02/22/2016 - 07:38

I love this bed! I was looking at the BM site and was wondering what exact stain did you use? there are 5 different opacities & I want to make sure I get the right one.  Thanks!! 

Fun

Submitted by Kelbs on Wed, 09/28/2016 - 21:17

This project was so much fun. I had to make adjustments for the size of my systems, but it was well worth it. I will be adding the doors later after our baby is old enough to crawl. Thank you so much for sharing this project!

Estimated Cost
125
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Paint and sealer
Recommended Skill Level
Intermediate
Back