Community Brag Posts

Large Covered Sand Box with Seats

Submitted by Anonymous (not verified) on Sun, 11/10/2024 - 20:03

Followed the plans for the sandbox for my granddaughter. She absolutely loves it and so do I since I have a seat I can sit at! I did enlarge it a little so added some supports. It works so great. - Sandy

Built from Plan(s)

My dream Modern Farm Table with Benches!

Submitted by mitchejl on Fri, 12/28/2012 - 17:52

My ex-marine uncle helped me build the modern farm table and benches. We bought pine from Lowe's. Not all of the pre-cut pine slabs fit the exact dimensions from the modern farm table and benches plans. We knew some of the wood would have to be cut again. A Lowe's worker was kind enough to use the store saw to cut some of the wood into the dimensions needed for the table and benches. He measured and remeasured.

Once in my uncle's garage, we first dry fit the furniture. My uncle started with the table. We dry fit the table on its back (in other words - we assembled the table upside down without drilling the table together). He then remeasured all of the wood for the table (while on its back). He wanted to be sure that all pieces would fit, once we started to actually assemble the table with drills. We did the same for each of the two benches.

Then we buffed out any dark marks or stamps on the individual pieces of wood. We did this by hand and not with an automatic tool. That part was BRUTAL.

Next we conditioned the wood. Wood conditioning is necessary, because pine stains unevenly. We waited 3 hours before applying the first coat of stain.

We applied the first coat of stain. Our stain was a mix of early american and golden oak. I did not intend for the table to come out as dark as it did. We mixed more of the early American stain than I had intended, because the table came out darker than I expected.

We waited in beween coats and we assembled the table and benches in between the first and second coat of stain.

We applied a second coat of stain to the assembled table and benches.

Then we applied polyurethane to seal and protect the stain.

After the polyurethane, we used wool to sand out any bubbles.

After the table and benches were assembled and everything drilled in place, we put wood putty in the places where holes were drilled.

Then, we stained the wood putty. The wood putty accepted the stain very well.

Duration

We built this table during the second week of August 2011. The project lasted between 28-30 hours over 5 days.

Make sure your boards of wood are fairly free from cracks. After inspecting them we put several boards back.

I love my table! I'm always complimented on its beauty. My materials cost around $230.00. I built this table, because the farm table and matching benches I wished to purchase totaled $2,000.00. Thanks to my ex-marine uncle, I have a fabulous table to last a lifetime. I mention his ex-marine status, because the military taught him perfectionism. Building a table with in 100 degree heat with a perfectionist was tedious and hard work. However, it clearly paid off in the end! Thank you Uncle!

Estimated Cost
$230.00
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
two stains: Early American and Golden Oak
Recommended Skill Level
Beginner

Comments

Whale cottage

Submitted by Anonymous (not verified) on Sun, 01/22/2017 - 09:46

 Thanks! I was able to use your plans for all the cabinets. Real easy to follow! 

Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Paint
Recommended Skill Level
Intermediate

Comments

No-Sew Upholstered Bed

Submitted by a_wolfe on Sun, 12/30/2012 - 16:34

Ok, so I was looking for a new headboard and stumbled on the plans for this Upholstered Bed.

Being without my full compliment of work this winter, I figured, what the heck. I'll try it.

Off I went to Home Depot, bought the supplies and got started.

I should mention that this was my first time doing any sort of carpentry, I have never used a jigsaw, and I had to borrow all the tools.

I found this SUPER easy! I had the headboard support finished in under an hour. Then I took my time cutting the plywood, just to make sure I didn't make any mistakes.

**I should mention right now, if you are planning on using a heavy upholstery fabric like I did, when you cut out the headboard insert, make 2 cuts! I wasn't able to get the insert to lay flush because the fabric was so thick! (I have since taking the picture added decorative trim to hide the little gaps)***

Once I had my plywood cut, I had no problem attaching it to the frame. The upholstery was a 2 person job that took a little time and a lot of staples, but not difficult.

I chose to tuft the headboard insert, and am so happy I did. It was time consuming, but worth it in the end.

All said and done, this took me a little over a week to complete. I had the construction done within a day or two, but the upholstery was very time consuming.

I love my new bed!

Estimated Cost
$275.00
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Heavy Upholstery Fabric:

DAWSON: OATMEAL

WIDTH: 55"

FIBER CONTENT: 43% Olefin, 42% Cotton, 10% Eco Cloth, 5% Acrylic


Painted legs with Annie Sloan Chalk Paint
Recommended Skill Level
Intermediate

Our.family.morgans

Submitted by Anonymous (not verified) on Tue, 01/24/2017 - 07:18

Thanks ANA for the plans!!

Built from Plan(s)
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Primer & paint
Recommended Skill Level
Beginner

Wall mounted can organizer

Added a backing of thin plywood to prevent the cans marking up the walls. I knew how many types of canned goods I wanted this to fit and adjusted the width to meet our needs. Love how this is going to save space in the pantry and with just a glance I can see what we have on hand.
Thanks Ana for another great plan!

Built from Plan(s)
Estimated Cost
About $150.
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Spray paint
Recommended Skill Level
Beginner

Comments

Outdoor bar and stools

Submitted by stevendaun on Tue, 01/01/2013 - 09:34

I built a 15" wide by 8' long outdoor patio bar with locking casters. I modified the stool design on Ana's website and stained both to match. I finished the top with stone tile and grout. This area has become the main gathering point in our backyard when entertaining.

Estimated Cost
$250
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Baer outdoor brown stain
Recommended Skill Level
Intermediate

Comments

Mini Wine bar

Submitted by ericaf on Sat, 10/18/2014 - 10:41

Be aware: some of the measurements and materials needed in the plan are off. For example, you need 1/8" hardboard for the bottom of the drawer but earlier in the plans it shows 1/4". Also, if you have larger wine glasses, you'll want to plane down your stemware holders so the distance between them is 3 1/8" instead of 3". It would have also been a good idea to pre-stain those before adding them in. Regarding stain, it would also look really good with a light stain. Another really nice thing about this project is that people are really impressed with it though it is fairly straightforward. :)

Built from Plan(s)
Recommended Skill Level
Beginner

Comments

ericaf

Fri, 06/10/2016 - 07:09

Thank you. :) I don't remember exactly, I believe it was regular Minwax wood stain, walnut and/or red mahogany. I will try to find what I actually used.

In love with this!

Submitted by Anonymous (not verified) on Thu, 01/26/2017 - 15:12

This is one of my favorite projects I've done! Very easy and fun! 

Estimated Cost
$140
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Antique white paint and semigloss
Recommended Skill Level
Beginner

Rollaway Workbench

Submitted by Indiri on Sat, 10/17/2020 - 18:26

I have a one car garage for my "shop" which means I can be really short on space. This build is perfect for saving space!

I made a few adjustments for the bigger saws (it's deeper and the center part is wider). I also used screws more in places that it called for nails but I wanted to be sure nothing would budge and also I didn't put the shelf backing on the one part where the table saw is in so I have better access to the saw while it's in place. I tried to use leftover wood I had in the garage wherever possible but I still had to buy 2 sheets of 3/4" and 1 sheet of 1/4".

Since I used more screws I may pretty up the front later with trim, I don't know. TBD

Estimated Cost
$150 because I used a lot of leftover wood
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
None
Recommended Skill Level
Beginner

Comments

Twin Over Full Simple Bunk-Bed

Submitted by Ksavtech on Wed, 01/02/2013 - 10:16

The twin beds that my boys were using took up way too much space in their small room so after much looking I found the Ana White site and this plan. The bed I made is per plan except for the addition of the side rails that slip fit onto the sides. When we change the sheets on the top bunk we just slip off the rail and stand on the lower bunk. We've had my two boys and three nephews all on the bed playing Xbox and it is rock solid!

Estimated Cost
$150
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Minwax Classic Grey and matte polyurethane
Recommended Skill Level
Intermediate

Loft Bed Tweak

 I added 6 inches to the height to be able to add a twin bed underneath. I also made the platform narrower to fit our room better. Love it. Cant wait to build more.

Estimated Cost
100$
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
None
Recommended Skill Level
Beginner

Fathers Day Gift

Submitted by Anonymous (not verified) on Mon, 01/30/2017 - 06:46

Weekend project for a friend. We built this for her husband for a Fathers day gift.. He is a fire fighter so we decided to paint it fire engine red.

Built from Plan(s)
Estimated Cost
$ 75-100
Estimated Time Investment
Week Long Project (20 Hours or More)
Recommended Skill Level
Intermediate

Christmas Tree Shelf

Submitted by Anonymous (not verified) on Wed, 10/21/2020 - 08:50

This is my first time using some of the power tools that this required, however, it came out SO CUTE! I put one together and someone bought it raw. I put one together as the video showed, and then did one out of old fence pickets that were cleaned up and planed by a neighbor. They both came out beautiful. We used knobs that we had in the shop and offset them a little to be whimsical.
Vasiliki

Built from Plan(s)
Estimated Cost
$8-12
Estimated Time Investment
An Hour or Two (0-2 Hours)
Finish Used
Entry way to home, by the front door.
Recommended Skill Level
Intermediate

Comments

Bunk Bed From a Loft Bed

This bunk bed was made out the Camp Loft bed plans. With my daughter out growing her toddler bed, we really needed a "big girl" bed without giving up too much space. This was perfect. It was really easy to add an extra set of 2x6's around the bottom of the loft, and poof, it’s a bunk bed. The kids really love it and it is really strong. I weigh about 250 lbs and it doesn't even move when I get on the top bunk. To accommodate for the lower bunk, I raised it to 72” high. As you can see, I also added extra vertical supports on the top rails. I did this so all the weight on the top bunk wasn’t only supported by the 2x6s, but also the 2x4s as well.

I also painted it white becuase that matched the other furnature in the room better than staining it. To keep the wood from seeping sap all over the paint, I sealed it with BIN primer before painting it with latex paint.

I don’t have much experience building furniture, but this was extremely easy. The wood cost us around $100. Slightly more than the post said, but I added a few extra 2x4s and since comparable bunk beds are being sold for about $800, this was a steal. The plans were great and my son and I had a great time building it. Thanks for posting it

Estimated Cost
$100
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
BIN primer (2 coats), latex flat paint, a lot of sanding
Recommended Skill Level
Beginner

Extra Long Bed

Submitted by Lumi on Fri, 10/24/2014 - 16:36

My hubby is 6'5'' tall. Since most matresses are 80 inches long, he mostly ends up with his feet hanging out of the bed (since you don't lay your head down at the very beginning of the mattress, right?). So I tried to solve this problem by making the bed 4'' longer than the plans suggested. I added 2'' of foam on each end of the bed, so now its 84'' long and my hubby fits perfectly!

Thanks for the great plans, I had a blast building my own bed!

Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

X console

Submitted by Anonymous (not verified) on Wed, 02/01/2017 - 19:37

X console 

Recommended Skill Level
Beginner

2x4 Banquette Seat

Submitted by boyledover on Sat, 01/05/2013 - 16:47

I have been wanting a banquette for years and when I spied Ana's version in the post about Grace's birthday party, I knew I could do it. I waited for the plans, and yesterday, I got out the tools and in 6 hours (real time - including cooking meals for kids, potty breaks, and life in general) I had my bench done.

I am so pleased with it. I had all the fabric on hand already, and was able to buy batting, foam and pillow forms all 50% off at Joann's, plus 2 zippers for the blue cushions. The woman who was cutting my foam asked me what I was making, and I told her I was building an upholstered bench for my dining room. She said "wouldn't it be less trouble to just buy one already made?" Clearly she has no idea how much this would have cost me. As it stands, I had the lumber and fabric on hand, so my total purchase price was just over $95.00. I would estimate the cost to build to be about $200.00 for everything, depending on how expensive your fabric is.

I love to sew, so I had no problem with the fabric portion of the project, though I did as Ana did and did not upholster the back of the bench. Instead of adding a piece of fabric across the back of the frame, I extended the side fabric by about 6 inches on each side and stapled it to the back. I hope that makes sense. I used a metal cleat to hold the seat back in place. I also used 3 L-brackets to attach the bottom to the frame. I think people will slide into their seat and I didn't want the seat cushion to move.

Not bad for a few hours work!

This project would be an easy starter project for building, though it is a little more advanced when you factor in the sewing. Here is the tutorial I used for the toss pillow cushions: http://sewmamasew.com/blog2/2011/02/add-a-zipper-to-your-pillow/, and here is another from the same blogger for boxed cushion covers (just leave the bottom off of yours for this project, since it will be stapled to the plywood, skip the zipper and handle, and add piping if you want to fancy your cushion up): http://sewmamasew.com/blog2/2008/07/summer-sewing-perfectly-portable-cu…

Thanks Ana for the constant inspiration!

Built from Plan(s)
Estimated Cost
$200.00
Estimated Time Investment
Afternoon Project (3-6 Hours)
Recommended Skill Level
Beginner

Garage Storage from Rescued Lumber

My daughter and I used these easy plans to build these two shelving units for the garage. We altered the plan slightly.The sizes that I used were determined by the lumber I had available as we used rescued lumber for this project. The height on each is 5' (tallest 2x4's we had) and the length is 64". All I had for 2x4's were 48" pieces so we used some other rescued lumber for the shelves. We used whatever we had. So they are made from misc lumber. The 2x material made for the strongest shelves. Depth is 17" as in original plans. 

We added additional brackets for support under a couple of the shelves. We also attached to the wall to avoid tipping. I absolutely love these. So useful. No more unstacking each tote to find out what's in the bottom one. I LOVE IT! Thanks for the plans.

We completed these in one afternoon. 

Estimated Cost
Used rescued lumber and screws already on hand.
Estimated Time Investment
Afternoon Project (3-6 Hours)
Recommended Skill Level
Starter Project