Community Brag Posts

PB Sawyer Trestle Look Alike

Submitted by samdwest on Tue, 07/17/2012 - 14:32

So my husband and I have this thing...I find the projects, he builds the projects and I get to finish it. I'm more of the artsy one and he is more hands on. So this is the first table we did from Ana!

Estimated Cost
$35
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Yellow Paint w/ Glaze...will update with specifics later!
Recommended Skill Level
Beginner

Table Centerpiece

I had some leftover yellow pine, and when I saw addictedtodiy.com's Fall Centerpiece post (http://addicted2diy.com/2013/10/31/diy-fall-centerpiece/), I knew what I wanted to do with it. That's right - make my own version.

Now if you view Katie's post, she obviously has a much larger table than I do, but if you like hers, she did a very good tutorial on how she created hers. I think both are beautiful.

I fit mine to my dining space and the jars that I had saved. I also modified my version to take advantage of my kreg jig since I am sadly lacking my own nail gun. One day, I will have one. One day.

If you want more specifics, take a trip to my blog post (http://www.trekkiemom.com/2014/05/table-centerpiece.html) for my exact cuts, etc.

Estimated Cost
$10-15
Estimated Time Investment
An Hour or Two (0-2 Hours)
Finish Used
Minwax Red Mahogany Stain and 2 clear coats
Recommended Skill Level
Beginner

Perfect for our crafting studio!

Submitted by Anonymous (not verified) on Sun, 08/07/2016 - 05:45

We made this a bit bigger for our crafting studio, Creative Grain Studio! 8x4!! Rustic and we are building a fourth today!!

Estimated Cost
75.00-100.00
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
sanded and used minwax espresso stain
Recommended Skill Level
Intermediate

Comments

Toddler Helper Tower

Submitted by rcornish4 on Mon, 05/25/2020 - 08:04

Great plan and instructions! My daughter loves it!

Built from Plan(s)
Estimated Cost
$50
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Gray latex paint with satin finish poly
Recommended Skill Level
Beginner

Farmhouse Hall Tree

Submitted by Anonymous (not verified) on Mon, 02/12/2024 - 09:04

Modified the top of Ana’s plan for a Hall Tree and very happy with how it turned out.

Steve Nadler, High Springs Florida

Built from Plan(s)

Clara Table and Stackable Chairs

Submitted by BethStew5 on Wed, 07/18/2012 - 22:01

I made this table and chairs set to go with my daughters new playhouse bed. I used mostly of scrap wood for the chairs so they each have a slightly different look. The chair seats are solid rather than slats.

Estimated Time Investment
Afternoon Project (3-6 Hours)
Recommended Skill Level
Beginner

Farmhouse Table

Plans were modified to change length of table to 8' and so that benches tuck under for winter storage. 5/4 cedar was used for table and bench tops-5/4 cedar was only available locally in 4" and 6" widths so we modified top slightly and made benches to match

Estimated Cost
$120
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Tung oil and Spar Urethane
Recommended Skill Level
Beginner

Better Than I Hoped!

Been working from home for the past two months due to the health crisis. To stop from going crazy from being at home with my wife and four kids, I decided up pick up a hobby - here's where my homie Ana enters! I didn't want the sectional for my patio, but certainly the couch, chairs and table. The only mistakes had were my own (using wood putty, not sanding it well), but the plans were spot on. The only real issue I ran into was the cedar wood I used wasn't 1.5 x 3.5, but 1.75 x 3.5. This caused me to make additional cuts were I otherwise would not have needed it. Other than that, just remember to make the longest cuts first... I ended up needing to buy about five additional boards because it.

Estimated Cost
$350 (I used cedar, which is much more expensive)
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Minwax Spar Urethane, clear
Recommended Skill Level
Beginner
Seasonal And Holiday

Vanity Flair

Submitted by cbeach1717 on Sat, 07/21/2012 - 14:43

This small vanity is having a huge impact in our powder room! We were thrilled to remove the builder's grade prefabricated vanity and replace it with this custom built table finished in multiple layers of homemade chalk paint and that will soon house a vessel sink.

Estimated Cost
$75
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Wood stain, chalk paint, wax
Recommended Skill Level
Intermediate

Aqua Woven Bench

This is aweekend project, also because I didt, and Im a beginner.. everyone can do it!

Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Rustoleum Exotic Aqua Spray Paint
Recommended Skill Level
Starter Project

Alden's two tone X book case

Submitted by Anonymous (not verified) on Sun, 08/14/2016 - 10:37

I built this book case for one of my Kids that wanted a new book case.

Estimated Cost
estimated cost $75,
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
rustic Mahogany wood stain (gel), apply Lacquer finish for additional protection and glossy finish.
Recommended Skill Level
Intermediate

Raised Bed Garden Enclosure

Submitted by Anonymous (not verified) on Thu, 05/28/2020 - 17:08

We perviously had a larger garden farther back in the yard, it was on the ground which is very hard and rocky. It was tough to till and maintain, so it was taken down a few years ago.

My wife and teenage daughter have green thumbs and have planted herbs and tomatoes in pots over the past few years, but this year they wanted something more substantial. After an online search we found this plan.

It was a bit small for what the girls had planned, so with a little bit of tweaking, we changed the depth of the enclosure to 10'. It was pretty easy to do. Also the girls wanted the beds to be a bit deeper, so we made them three 2x6's deep instead of two

It was built by my wife and I in one weekend, well actually the truth is we built the entire enclosure, minus the door on Saturday about 10am and finish up about 5:30pm. I built the door the next day and we hung it together.

Just an FYI, I have quite a bit of woodworking experience and have a workshop with table saw, band saw and much, much more. I did use the table saw for most of the cuts, with the exception of the gate support which I cut using the band saw.

One caveat, if you have the lumber yard cut any pieces for you, make sure all the lumber is the same length. It's kind os a nit picky thing, but none of the lumber was exactly the length shown on the labels. If you want all the joints to be "perfect" I suggest measuring and cutting all the pieces to the correct length to match the plans.

We also used an industrial hand held staple gun to fasten the chicken wire.

The cost of all the materials, including two sets of work gloves came out to $447.92 from Home Depot in 2020.

We are now waiting for a delivery of the top soil to fill the beds. Since we used weatherguard lumber, we are going to gat plastic sheeting and line the beds.

It was a fun project and my girls are looking forward to planting all their seedlings.

For fun we made a time lapse video, which I have uploaded to Youtube. If you watch closely, you will see that we started the build in one area of the yard and moved it because the ground sloped much more than we originally thought.

https://www.youtube.com/watch?v=h7vvBLy034U&list=WL&index=112&t=0s

I hope that our experience may help others in some small way.

Thank you Ana for making these plans available!!

Built from Plan(s)
Estimated Cost
$447.92
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
None.
Recommended Skill Level
Intermediate

Comments

Simple Outdoor Bench From Pallets

Your simple outdoor bench but a bit revised...I made it out of wooden pallets! the pallets were free from a local hardware store so the total cost of my bench...$9.00!

Estimated Cost
$9.00
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Red Mahogany
Recommended Skill Level
Beginner

Comments

Allywarner3

Mon, 07/23/2012 - 11:33

Loved the design of this bench! I am very much a diy person so I decided to try the pallet...it worked beautifully! Can't wait to get on to the next pallet project! good luck with yours!

Rustic Console - my first project

Submitted by loulie on Thu, 05/15/2014 - 09:51

Rustic console -first project..plan on adding X to ends

Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Top is the infamous steel wool vinegar solution with wipe on poly
Left the shelves as is since the wood was so pretty
The rest is a combo of vinegar stain, then a custom mix of gray paint wash and emerald green...♥love it!.
Recommended Skill Level
Beginner

Comments

White and dark walnut

Submitted by Anonymous (not verified) on Wed, 08/17/2016 - 09:15

Fun to build, looks beautiful in our dark dining room. Used 5 tabletop pieces instead of 4

Built from Plan(s)
Estimated Cost
$120
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Bulls eye primer - 2 coats.
Benjamin Moore snow paint - 2 coats
Applied with small rollers

Minwax Dark Walnut stain- 2 coats. Polyurethane - 3 coats.
Applied with foam brushes
Recommended Skill Level
Intermediate

Twin Beds

Saw plans on here and my girls loved the bed so we got rid of the bunk beds and now they have their own beds. The original plans were for a king or Queen so had to redraw the project out for twin size beds. I had never made drawers before so that was fun. Learned a lot and now onto the next project.

Estimated Cost
$250
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Mahogany stain (minwax)
Recommended Skill Level
Intermediate

kitchen island

Submitted by jvos on Wed, 07/25/2012 - 16:40

This is my first project. I made a lot of mistakes but also learned a lot as well. I have very little counter top space and so wanted an island for additional work space. I had to downsize it due to my small kitchen but it seems to be about right. I got a kreg jig for this and it makes for a solid project. Next up, a platform bed!

Built from Plan(s)
Estimated Cost
$60
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Polyurethene & paste wax
Recommended Skill Level
Starter Project
Back