Community Brag Posts

Console

Submitted by cjlaw on Wed, 06/10/2015 - 13:44

We really liked the design of the console table. We built an entry way table and a coffee table to match. We did change some of the measurement to suit our particular needs. We are very happy with how this one turned out. Next we plan on making some end tables to match also.

Built from Plan(s)
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Stained top and painted bottom.
Recommended Skill Level
Beginner

Sweet dreams bunk bed

Built this for our 6yr old. She has decided she wants it to be pink so we picked out a beautiful Aubrey Hepburn worthy shade and will update our photo. 

Built from Plan(s)
Estimated Cost
$100 materials + $36 Pocket Hole Jig
Estimated Time Investment
Day Project (6-9 Hours)
Recommended Skill Level
Beginner

Cornhole Boards #1

Submitted by JLFarquhar on Sun, 12/26/2021 - 17:14

This is the first of the cornhole boards this year. Having never made such before, I learned a lot of the tips and tricks in this build. This build begins with cedar 2x4s and cedar fence pickets that I took down this last summer. I began by sanding the boards starting with 60 grit through to 320 grit with a belt sander up to 180 grit and hand sanding through 320 grit. The frame was glued up with Titebond II, then counter-sunk #8 x 1-1/2 screws. Next, we used nine (9) different cans of Rust-Oleum semi-gloss paint to fill in the background and to cover the moose and bear senciles drawn by my wife. The boards were then coated with Minwax Poly-Acrylic (9 coats) and Howard's Bee's Wax (6). The boards are secured with 3-inch toggle fasteners and the handles are Kayak straps with four (4) screw holes; I used the same Torx screws for strength and stability.

Comments

Outdoor Pine Canopy Daybed

Submitted by evilmom on Sun, 05/01/2011 - 14:01

This is my first venture into woodworking/carpentry. Since I did not want to shell out too much money for lumber, I used untreated pine (worst wood they say to use) for the daybed and used an exterior wood stain (with uv protection) to seal the wood. I also did not invest in power tools and used a hammer and wood saw to cut and nail everything together. As I cannot sew, I waterproofed the mattress by sandwiching it between two plastic mattress covers (dollar store) and duct taping the seams. It's not elegant but no one is going to see it. I used a cotton fitted twin sheet (old one) for the cover and found some outdoor pillows for $16 a pair ($8 per pillow and made with solarium fabric). Also as this is placed outside (deck), I'm looking into getting a mosquito net to use over the daybed instead of the bed tent I have on right now.

In hindsight, I should have used pressure treated wood for the posts and canopy beams to prevent bending/twisting (I had to re-do 2 posts). If I get 3 years of use for this furniture. I'm a happy camper. Ana, thank you so much for the plan. Kathy thanks for the advice on painting the lumber first.

You guys can do this!

Estimated Cost
$70 for the lumber, $ 40 for stain, sand paper, nails, wood glue, $4 for mattress cover, duct tape
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Olympic exterior wood stain with UV protection (oil based).
Recommended Skill Level
Intermediate

Vintage kitchen shelf with hooks

This is my first project. I had to shorten the width of the shelf to fit the space I had for it. The board on the back is also a 1x4 instead of the 1x3 that was in the plans. This was a great first project for anyone.

Built from Plan(s)
Estimated Cost
N/A. Since this was my first project, I had to buy wood, tools, paint, hooks.
Finish Used
First I used one -coat of mini-wax oil based stain in Colonial Maple. The color was nice but a bit too "orangey" for my taste. I then used one-coat of mini-wax water based stain in toffee. Much better results for my taste. The final clear coat was also water based.
Recommended Skill Level
Beginner

Entry Bench and Shelf

Submitted by MatthewC on Tue, 06/16/2015 - 08:51

This was my second build, very easy with the plans. I wanted it flush with the wall so used a jig saw to cut notches in the bottom to fit around the baseboard. I was also covering an air vent, so I built a simple air diverter out of 1x's and bought a decorative vent cover of Amazon for $10...worked out much better than I thought it would. Painted with a flat black then a few coats of poly.

Estimated Cost
$100
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Paint and polyurethane
Recommended Skill Level
Starter Project

Three Beds and Desk

Submitted by Owen Farms on Sat, 01/06/2018 - 02:13

Trundle bed and desk addition.

Built from Plan(s)
Estimated Cost
450 dollars
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Poly coat
Recommended Skill Level
Intermediate

Comments

Small Rustic X Console

Submitted by Anonymous (not verified) on Mon, 12/27/2021 - 02:36

My first project!

Built from Plan(s)

Comments

Child's Book shelf

Submitted by Marisol on Wed, 05/04/2011 - 20:20

First Project...really got me hooked! It's only 4 feet tall so it really was a cheap one...

Built from Plan(s)
Estimated Cost
$15.00
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Behr white paint with primer
Recommended Skill Level
Starter Project

Coffee Station Cubbies

Submitted by scokenour on Sun, 06/30/2013 - 19:29

I wanted to make something to organize the coffee supplies in my office breakroom, so I made these cubbies using the same basic concept as the Vegetable Bins. I used 1 - 8' 1x4, scraps for the angled pieces and 1/4 plywood for the back and front of cubbies. I was able to construct primarily with glue and nail gun. I chose "intermediate" level because you may need to make tricky cuts using your miter saw that beginner may not be comfortable with.

Built from Plan(s)
Estimated Cost
$8
Estimated Time Investment
An Hour or Two (0-2 Hours)
Finish Used
vinegar/steel wool stain, paste wax
Recommended Skill Level
Intermediate

Comments

Headboards

Submitted by fiddlepics on Mon, 01/08/2018 - 07:31

Built these for my boys room- these headboards are for highrisers so I did not use legs- they end at the bottom of the slats.  I used 1x3 furring strips for the slats to keep the costs down, I believe I used 10 slats. In order to mount the headboards, they are completely mounted on the wall and not attached to the bed at all. I used 3-2'' Z clips,  at the top, tried to get them drilled into wall studs. To keep the headboards even more secure, I used corner braces on the bottom- 2'' braces, drilled into the wall with anchorless screws and then drilled into the bottom of the headboard frame. 

 

I also did not cut the wood at the hardware store- I purchased a circular saw and was very happy with the decision. Was MUCH better to cut as I built. 

Estimated Cost
$75-$100
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Minwax penetrating stain- 2 coats dark walnut, 1 coat red mahogany. Spray Minwax Lacquer in Satin
Recommended Skill Level
Beginner

Ice Trough Table

Submitted by SHiggins03 on Mon, 12/27/2021 - 11:37

Wanted to try something different for my Secret Santa gift. Didn’t have the exact plans I needed so I based it off others. Built this to fit in and out of an RV entry door. It also has a drain valve underneath. This was my first without a plan project

Comments

Sweet T's Entry Way

Submitted by Sweet T on Sat, 05/07/2011 - 20:23

Finally had some nice weather and finished this entry way and shelf project! Did have to change the side cuts to 11 1/4" because 1 x 12's are not 11 1/2 " wide. But other than that this project went very smoothly. The building only takes several hours. However the finishing does take hours to days depending on the weather.
I also used the leftover plywood to upholster the bench cushion.

Estimated Cost
$110 includes 3 hooks and the hardware to hang the shelf
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Primer, Ralph Lauren Tribal Pottery and Satin Nickel Tri-hooks
Recommended Skill Level
Beginner

Modified Farmhouse Table

I have had the same kitchen table for years. My wife and I finally got out of the city and into the country and decided that the small Crate and Barrel table we have had since we first got married had to go. Looking through some plans I came across this one http://tommyandellie.com/index.php/2012/01/13/new-and-improved-farmhous… and decided it was just what we needed to fill the dinning area in our new home. I modified the table I built from the original plan as I was trying to do it cheap and keep it at about $100. After playing with some ideas I decided I was going to make the top completely out of 2x6 and delete some other items from the original plan so that the chairs can just slide under the table and wouldn't need to lift them at the head of the table to push them in. The table top is 72"x44" and the bench is 54"x14.5". I hope you enjoy it.

What I used.
10 - 2x6x96 - table and bench tops
2 - 4x4x96 - legs - each 4x4 makes 2 bench and 2 table legs
6 - 2x4x96 - bench top, apron and supports.

Cut List
Table 72 x 44
8 2x6x61 - Table Top
2 2x6x44 - breadboards - measure these when the middle section is done for the table top, as it is the total width of the top.
4 4x4x28.5 - table legs
2 2x4x35 - end apron
4 2x4x38 - inside supports
2 2x4x58 - side apron

tools
Saw
Kreg Tool
Drill
Measuring Tape
Pencil

Bench 52x14.5
2 2x6x42 - bench top
3 2x4x42 - 1 bench top 2 for side apron
4 4x4x16x5 - legs
2 2x4x5 - end apron
3 2x4x8 - under supports

I put this at a week long project because of the way I finished it. If you just put your stain on and wipe off, it will take you a day and a half to do and you could use it lightly the second day if you have the right conditions for the poly to dry. I did use a Kreg tool and everything is held together with pocket holes, skip the glue, the poly on the top will keep things from going through the cracks.

Estimated Cost
$100
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Minwax English Chestnut - heavy coat left to dry over night a light sand then light reapply of stain.
Minwax Satin Polyurathane - 2 coats on areas not in contact with heavy use i.e. legs and stringers, table and bench top got 4 coats, sanding between coats to smooth any imperfections with 400 grit sand paper.
Recommended Skill Level
Beginner

Comments

Play House For Ece & Zeynep

Hi, My name is Ibrahim I am a Project management Unit Manager in an Information technologies. I have two daughters, 3 and 8 years old. We have garden around 150m2. I want to do play house in our garden to play. First of all I searched how can do it in internet. Than I did preliminary work. I provided equipment and materials. And I take a holiday my company as a week. I started my first project which is wooden house.

My daughter and all around me was liked wooden house. I hope you like it:)

Sorry my English :)
.

Estimated Cost
all inclusive around 1.500 TL (Turkish Lira) around 564$
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
I painted white and pink the project.
Recommended Skill Level
Starter Project

Comments

Craftsman style playhouse with raised deck (and power/lights)

Submitted by Ruth Ward on Sat, 01/13/2018 - 06:27

I needed a project to keep me together during 2017, as I took maternity leave after the birth of my second son. I wanted something that both boys could grow into, and enjoy, for many years to come. I also wanted to challenge myself to go big.

Our garden is tiny, so I was really attracted to the idea of raising a playhouse up and gaining the space underneath too. This corner was taken up by a big wooden raised pond, which wasn't wildlife friendly because of the high sides - and that meant you couldn't see the water unless you walked right up to it, either, so it seemed like a bit of a waste of space.

First of all I took out the old pond, and dug up tons of invasive bamboo that was growing around it. Then I lifted and relaid the concrete paving slabs underneath, leaving a smaller pit for a sandpit in the middle. With that all in place, I was ready to start building.

Wood tends to be expensive in the UK, and given the amount of rain we get I wanted to get the roof thoroughly waterproof and the windows covered. I also included a layer of polystyrene insulation behind a additional plywood inner walls, and I painted the whole thing in rot-proof garden paint. Everything added up, and the materials cost was probably £1k or more.

If I'd been able to work continuously, I reckon I would have completed the whole project in a week or so. However, I was mostly only able to get out in the garden when both my sons were napping (about 2 hours a day) or at the weekends when my husband could watch them. Given the time constraints, I was expecting this to be a long project. I started in April 2017 and completed the build late in October.

The deck was finished in June, and the sandpit in the shady space underneath was a great resource on the hotter days of summer.

The old garden shed we inherited when we moved in here is rotting away, but it had power and lighting which the electrician told us was sound. I transferred the circuit into the playhouse, securing it behind the inner wall and installing a plug socket and a ceiling light. Having the power socket means that we can take a little electrical heater out there, and (under supervision) the three year old has been able to play in his little house throughout the winter.

One issue has been that water tends to pool on the deck in front of the house, and then seep under and into the house. When a big furry throw got left out there for a couple of weeks it acted as a wick and sucked the water up and into some of the plywood at the back, making it a bit manky and mouldy. We've learned our lesson and I've now run a bead of general purpose sealant along the front of the house, preventing water running in. The decking boards came with grooves for added grip, which helped channel the water along, and this was worse by the doors because I kept the doors a centimetre or so above the floor, leaving a gap. I've added a thin strip of wood for a lintel and sealed that too.

Now that we're on top of the damp issue I'm planning to paint the interior, add some old water-resistant flooring boards that I found in the shed when we moved into the house, and generally spruce things up. I hope this will be a comfortable den for the boys for years to come.

Thanks, Ana!

Estimated Cost
£1k-1.5k
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Cuprinol outdoor paints (blue and pink); Wickes own brand wood preserver (dark brown)
Recommended Skill Level
Beginner

Rustic Modern Hall Tree

Submitted by Anonymous (not verified) on Wed, 12/29/2021 - 02:48

I made this slightly smaller version of Ana’s Hall Tree to fit smaller spaces. I added beadboard to the back to put an added farmhouse touch. Finished in Golden Oak and white.

Built from Plan(s)

Comments

Our First Project!

Submitted by gabbiegal on Tue, 05/10/2011 - 20:02

We have built things before, but this is our first from Ana's Site. We just finished this over a month ago... Was so much fun to do and I just love how it turned out! I decided not to paint just yet, so the buyer can decide. I have just primed it. I learned how to use a kreg jig, and bought a very cheap one... Best tool ever. There are no screws visible at all. I think if I did it again I would do something different with the handle.. not sure what though. It was difficult to make it look right. Thank goodness for the patience of my husband.

Built from Plan(s)
Estimated Cost
$40
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Primer Only
Recommended Skill Level
Beginner

Channing Bookcase

Submitted by FrankJr on Sun, 06/28/2015 - 13:42

We needed a bookcase to fill a void in our living room and this was it. I altered the dimensions to increase the height to 72.5". I also added crown molding to the top which turned out nice. I used the same Bombay mahogany stain suggested by a previous post.

Built from Plan(s)
Estimated Cost
$150
Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

Greenhouse

Submitted by Anonymous (not verified) on Sun, 01/02/2022 - 12:30

Built the greenhouse from Ana Whites plan
She did the plan really well..

Built from Plan(s)

Comments