Community Brag Posts

Two Drawer/Shelf Modern Nightstand

Submitted by Meagan84 on Mon, 10/01/2012 - 11:49

I built these nightstands to replace the mismatched ones in my bedroom. I'm going to use the lower shelf to charge my phone, iPad, and things like that. It'll be nice to have them out of the way.

This was a very easy build, but it took me a while to make, simply because I made a pair and there was a lot of cutting to do. I had never done drawers before, and they were a little tricky at first, but by the time I got to the last one, it went on super fast! Ana's plans are very clear, and easy to follow! Thanks Ana!

Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
I used two coats of Valspar Paint + Primer in Mercer Blue
Recommended Skill Level
Beginner

Comments

Channing Desk and Hutch

Submitted by brittanyj on Fri, 07/25/2014 - 09:06

Made this desk custom for a friend and I am so happy with how it came out. Took around 4 days with finishing. I didn't put a back on it because drilling those holes for cords always goes rather splintery. If he wants a back we can easily put it on. The top ended up having strange coloring with the Dark Walnut stain, I think because of the wood filler, but I like it because it gives it a rustic old world kind of look. I saved a lot of money by hounding the scrap bin at Home Depot several times a week, looking for wood on Craigslist, and raiding my leftover stash. I modified the side so there was a tower partition and a shelf on shelf pins- courtesy of Kreg shelf pin jig. I used moulding I had sitting around to cover the exposed edges of plywood.

Built from Plan(s)
Estimated Cost
30
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
wood conditioner, Rustoleum Dark Walnut stain, floor poly (just what I had lying around). Applied stain with sponge brush, then wiped excess. same for conditioner. poly applied with paintbrush.
Recommended Skill Level
Intermediate

Very easy garage shelving

Submitted by Anonymous (not verified) on Sat, 11/05/2016 - 23:22

Wanted some easy storage shelving that didn't break the bank.  These were perfect!  $79 is what it cost for ours (which includes the $20 Kreg Jig).  Lumber was only $58.68 and I bought and extra 8 foot 2x4, so it could have been slightly cheaper!  

Estimated Cost
$60 for lumber
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Boxes, Totes, camping equiptment
Recommended Skill Level
Beginner

Farmhouse Coffee Table

Submitted by Anonymous (not verified) on Sun, 07/26/2020 - 21:41

This was a fun project to build! It took about 1.5 hours to build start to finish, with another couple of hours to stain and then seal.

Estimated Cost
$43
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Dark Walnut stain and Satin Sealer
Recommended Skill Level
Beginner

Cedar House Number Planter

Submitted by Anonymous (not verified) on Sun, 06/30/2024 - 12:30

I've used a few plans from Ana since I found her over the past year, but this is my first brag post! This plan helped to inspire me to make something similar! I used some free pallet boards instead of cedar fencing, and modified the plan by adding a solar powered fixture to it, so you can see the numbers in the evening as well. I attached it to my siding using vinyl siding hooks and D-rings, so I wouldn't have to drill into the side of my house as well because I I'm a happily lazy builder! Added fake flowers leftover from our wedding because I KNOW I'll forget to water real flowers if I put them in here haha.

 

 

Seasonal And Holiday

Rustic Patio Table

Submitted by worrow on Thu, 10/04/2012 - 20:00

Well my wife and I wanted to create a patio table again for our daughters birthday. I spent some time looking for something that would spark some ideas and found an old wooden spool. So I brought it home also with a large quantity of various lumber, all reclaimed. So we put a plan together quickly and started tackling the project. So far I am 2 days in and have got it built and sanded.

This has been an interesting build thus far and some parts of it have required 2 people as the top is very heavy. Also was difficult to get the spool apart as the bolts were very rusted.

a few more days and I will have it finished being urethaned.

I am also going to use the other top of the spool and create 2 matching benches. This will likely add another 3+ days to the completion of the entire set

Update 05/06/2013
So I completely forgot about my brag post. I did not end up building any benches and also forgot to post the finished table. Here it is in all it's glory. It served it's purpose well.

Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Will be using gloss urethane and likely about 3 coats.

*It required all 3*
Recommended Skill Level
Beginner

Comments

dmcarwin

Fri, 10/05/2012 - 13:11

I have a couple of spools that I picked up and have been deciding what to do with them. This table is awesome! I love it! Can't wait to see the benches!

Side table

Submitted by sparkyht55 on Mon, 07/28/2014 - 17:06

My Dad wanted a table for his chessboard to sit on with the wood from the board to match the table. I had seen this design on the website and liked. It was different then the last table I built, so a new thing to learn. This is my 3rd wood project. Not an overly challenging build, but like anything, special attention to getting everything square and (lesson learned) drilling the 2x2 with the pocket holes, ensure they are lined up, centered and the correct depth. It came out very nice, and I'm sure Dad will enjoy.

Built from Plan(s)
Estimated Cost
about $40
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Two toned oil based stain on pine. For the top used pecan stain and espresso and polycrylic finish from: http://ana-white.com/2012/12/minwax-two-tone-oil-based-stain-pine
Recommended Skill Level
Starter Project

Modified TV stand

Submitted by Sb1212 on Mon, 11/07/2016 - 22:49

This measures 70in wide. I added a second shelf as well. I used plexiglass in the doors. I really love how this turned out!

Built from Plan(s)
Estimated Cost
60
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Valspar Olympic Black paint satin finish
Recommended Skill Level
Intermediate

Comments

Farmhouse Queen Bed

Submitted by frmoody on Tue, 07/28/2020 - 17:35

I have built two of these modern farmhouse beds. One from the original farmhouse bed plans and one from the updated plan. This bed was basically the original plan but with the headboard and footboard built with horizontal boards. I did not like the revised farmhouse bed plans and the sides were way to heavy and more complex than they had to be. The were also supported only by pocket screws but I did block underneath each end to add more support. For the slats I also purchased #1 prime 1 x 4's as opposed to construction grade. They were nice and smooth and no need to sand or paint.

Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Customer just wanted a very light white finish so I used a diluted white paint more as a wash and then a couple of coats of matte varathane.
Recommended Skill Level
Intermediate

Comments

mmade

Sat, 02/20/2021 - 21:02

I love this! It’s exactly what I want. It’s like the mix of Ana’s two different farmhouse bed plans. I like the horizontal boards instead of the vertical and I didn’t want the ledges on the side trails. Thanks for showing me the way. :)

Shoe Organizer

Submitted by moemoore on Mon, 10/08/2012 - 04:05

Between my husband and I, we routinely have 10 pair of footwear by the front door. In Hawaii, its tradition that you remove your shoes at the door. Unfortunately for us, our condo doesn't have much room by the door. As such, there would often be a pile of footwear as you entered the unit, which is the kitchen. I have tried various shoe organizers over the years, and none really fit the bill, or the space we had. So I built one myself.

Its a pretty basic box, with 1 fixed shelf. All joined with my Kreg jig (of course). I also attached some casters on the bottom to make it easier to move out of the way if needed. After assembling and painting, I picked up some moulding and added it to the bottom, which helped to hide the casters. Then I used some old liquid nail/caulk I had to fill in the holes.

Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
white paint
Recommended Skill Level
Beginner

John Deere Green Barn Shelf

Submitted by Veronica P on Wed, 07/30/2014 - 22:08

After finishing my boys' new John Deere room and tractor bunk bed (also posted), I saw this plan and thought it would be the perfect thing for some extra toy storage.

Yes, I know, barns are supposed to be red. Everything else in the room is John Deere green and I had paint leftover, which is not cheap. So green it is! I used my new paint sprayer for the first time on this project and am thrilled with it. I would recommend it to anyone who dislikes painting as much as I do. I bought the Wagner Flexio 590 which comes with a detail sprayer as well as the full size and I'm very happy with both.

Thanks to Ana for the well laid out, easy to follow plan and also for helping me create a big boy room that my boys love!

Built from Plan(s)
Estimated Cost
$60.00
Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
John Deere green paint plus primer, black & white paints, white paint marker for the shingle detail and satin polyurethane.
Recommended Skill Level
Starter Project

Comments

Veronica P

Thu, 07/31/2014 - 09:38

Thanks so much for your comments. It's so nice to hear positive feedback since I'm very new to this! My 3yr old is quite particular about everything being in its place, I'll pass along that you liked his animal placement. Lol :)

Homework Table and Chairs

Submitted by Anonymous (not verified) on Sun, 11/13/2016 - 14:08

Needed a small "homework" table for my 6 year old. Looks more appealing in the living room than the Disney Princess table she's has since she was 2. Super simple build and very affordable!! This is my 3rd project from Ana White and definitely not my last.  

Estimated Time Investment
An Hour or Two (0-2 Hours)
Recommended Skill Level
Beginner

Kids Toy Outdoor Storage Box

Submitted by MattCad on Sat, 08/01/2020 - 20:28

First time making anything half decent and it turned out ok. Followed the Cedar Box plans with a few adaptations. I live in regional Australia so used different materials, also extended the length. Used an app on the phone to convert the measurements to as close as I could. Worked out well, a few teething issues but does the job.

Estimated Cost
70 AUD
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Intergrain Merbau Stain
Recommended Skill Level
Beginner

Comments

Lillian's bed

This is my first attempt at building furniture. My wife found the plans and after some research of how much it would be to purchase a bed that would be similiar, my wife decided I was building one. I must admit at the time I was not very thrilled about this idea, but I have experience with building so I thought I could handle the challange. My background knowledge is in framing and deck building, not so much furniture building and finish carpentry. I printed out the step by step plans for the bed from Ann's website and went to work. I added the stairs and the slide and build them to fit perfectly on one wall of her room. I built a small door so she has a hide out under the slide which she loves to go in and read. Under the stairs I built in some storage. After this was done, I was really happy with it. My wife, my daughter and my brother also helped during the process.My daughter loves this bed. For a week she was running around the house saying "I have the best dad ever!" and to this day the first thing my daughter says to people who come to our house is, "Do you want to see my bed?" Looking foward to building more.

Estimated Cost
550.00
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
The pink paint is called very sexy pink. (My daugher picked the colors) Latex based primer and paint.
Recommended Skill Level
Intermediate

Cornhole Boards

Submitted by djsaffer19 on Sun, 08/03/2014 - 20:08

Custom cornhole boards, made with pocket joinery

Estimated Time Investment
Weekend Project (10-20 Hours)
Finish Used
Spray paint, stain, decals, always covered with polycrilic
Recommended Skill Level
Beginner

Comments

Kids chair

Submitted by Anonymous (not verified) on Wed, 11/16/2016 - 09:25

Childrens chair 

Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Dark walnut stain. Lemons edge Valspar paint. Sprayed the whole thing with clear gloss spray paint.
Recommended Skill Level
Beginner

Fence Picket Shed

Submitted by EDempsey on Tue, 08/04/2020 - 11:45

Using the Small Cedar Shed plans as inspiration, I created this 3'x6' shed using pressure treated fence pickets as the siding. I also made the shed one foot taller than the original plans to have a taller single door instead of the double door in the plans. Used 2x4 framing to strengthen the shed. Overall, I am pleased with the results. This was my first time constructing any type of building.

Estimated Cost
$475
Estimated Time Investment
Weekend Project (10-20 Hours)
Recommended Skill Level
Beginner

Trestle table

With two small boys it took me several days to make. I had some problems in the beginning because I cut the legs using a carpenter square and not a miter saw. But it worked out in the end. I love the way it came out!

Estimated Cost
60
Estimated Time Investment
Afternoon Project (3-6 Hours)
Finish Used
Miniwax Dark Walnut
Recommended Skill Level
Intermediate

Rebecca Media Center (kind of)

Submitted by Medickep on Tue, 08/05/2014 - 22:02

I've been wanting to build some built ins in the recessed area surrounding our fireplace for awhile now. I wasn't really sure how I wanted to tackle this and at first it was just going to be shelves from the floor up. After browsing around, I stumbled onto Rebecca's media center and could see how I could turn this into my built ins!

The whole thing is mostly boxes placed next to one another with trim that covers all of the seems. The bottom left and right cabinets were inspired by her media center side base and the middle of the bottom row is a modified version of the center console piece. For the top I combined the console side and hutch piece to get something that would work for me.

I learned a lot on this project and tried to take my time. Using trim across the entire project help make it look like one big piece of furniture. One thing I would do differently if I was to do this again is to use higher quality trim, such as hemlock as the pine required lots of wood filler, sanding and time, all which exceeded the cost difference between the two types of lumber. I used the Kreg drawer jig for the first time, which was nice and also used the Kreg shelving jig after I decided to make all of the shelves adjustable. It to was a nice and easy to use tool. A must for anyone who makes adjustable shelves.

I sanded, sanded and sanded some more and than put two coats of high quality primer (57$/gallon) from Rhodda, which was a God send. It hid all of the imperfections and created a nice smooth area to paint, which I used foam rollers and the Renaissance paint also from Rhodda. They said it went on and dried like a oil paint, which I love, but cleaned up with water. It was awesome paint to work with, but we'll see if it gets that hard eggshell layer that oil paint gets. It's already pretty hard the night I painted it!

The hardest part for me was going to the local Woodcraft store and deciding what hinges I need and how to adjust them perfectly! This was so hard as the tolerances were minimal and I wanted everything to be uniform. I could probably adjust them a little more!!

I included a picture of what the area looked like before!

The idea I had, which was the best, was when it came time to decide on a color, I had my friend who is handing in Photoshop, show me several colors on a picture I took. This changed the planned several times and save a lot of money in paint. In the end, we decided to paint them the color of the walls to make them look like they were always there. It also worked with the stained mantle next to them!

Estimated Cost
More than I want to calculate!
Estimated Time Investment
Week Long Project (20 Hours or More)
Finish Used
Rodda primer 2x coats. Rhodda Renaissance paint 2x coats.
Recommended Skill Level
Intermediate

Comments

Medickep

Wed, 08/06/2014 - 10:15

The build was much easier than the finish work, which surprised me a lot! I learned a lot on this project including having good corner clamps!

Booksnotbomb-

You can totally do this, which is why I included some of the earlier photos showing it was just a bunch of boxes! PM if you need help getting started!

corner cupboard

Submitted by Anonymous (not verified) on Sat, 11/19/2016 - 16:25

Finished it with two coats of shallac and used black iron hardware.

 

I built it for a cabin I am building. Thank you for the palns, they were great!

 

Built from Plan(s)
Estimated Cost
Around $100
Estimated Time Investment
Day Project (6-9 Hours)
Finish Used
Two coats of Shallac
Recommended Skill Level
Intermediate
Back